Image of the proposed rehabilitation of Third Street Bridge with LED
lighting observed from the riverfront walkway (Photo via the Municipality of Chatham-Kent)Image of the proposed rehabilitation of Third Street Bridge with LED lighting observed from the riverfront walkway (Photo via the Municipality of Chatham-Kent)
Chatham

Third Street Bridge reopens early

A major thoroughfare in downtown Chatham has reopened a day early.

Construction on the Third Street Bridge over the Thames River wrapped up early and reopened at 5 p.m. on Thursday, July 3.

The bridge was scheduled to be closed until 7 p.m. on Friday to replace deficient asphalt on either side of the bridge.

Brendan Falkner, the Manager of Engineering previously said the repair was at no cost to the taxpayers of Chatham-Kent and was covered by the company that originally did the work.

The Municipality of Chatham-Kent would like to thank the residents for their cooperation and patience during this closure.

Read More Local Stories

(File photo courtesy of © Can Stock Photo Inc. / dehooks)

Scoreboard, Aug 5

The Toronto Blue Jays lost 7-2 to the Houston Astros on Tuesday while the Detroit Tigers won their fourth straight, 8-0 over Seattle.

Baseball fans celebrating in the stands. © Can Stock Photo / djpadavona

Scoreboard, Aug 4

The Toronto Blue Jays snapped the Astros' six-game winning streak with a 3-1 win in Houston Monday night.